Enter the building details, choose the construction material, condition and roof covering, and the tool calculates the Estimated Replacement Value and Estimated Current Value automatically. Material rates escalate 7% year-on-year from 1 January 2027, based on the Date of Valuation.
Basic details of the cession being valued.
Please enter a building size greater than 0.
Used to escalate the construction material rate (7% per year from 1 January 2027).
Select the primary construction material. The rate shown already includes escalation to the Date of Valuation.
Please select a construction material.
Select the condition that best describes the building.
Please select a condition assessment.
Select the roof covering material. Its percentage is also applied when calculating the Estimated Current Value.
Please select a roof covering.